Save up to £224 per year in running costs with a FilterPod Non-Electric Sewage Treatment Plant
All WTE designed sewage treatment plants clean wastewater to a very high standard using less energy. However, the FilterPod uses zero electricity. You can save up to £224 per year on running costs compared to other leading makes.
. Electricity cost savings with FilterPod Based on a 5 person household 0.33p per kWh.
Annual Electricity Costs | FilterPod | Other Manufacturers |
---|---|---|
Worst Performance | £0 | £244.00 |
Best Performance | £0 | £122.00 |
Average Performance | £0 | £183.00 |
Annual Carbon Produced from Electrical Consumption Based on (1 kg of carbon per 0.193/kwH).
Carbon Produced by Electricity Consumption | FilterPod | Other Manufacturers |
---|---|---|
Worst Performance | 0 | 135.1kg |
Best Performance | 0 | 67.5kg |
Average Performance | 0 | 101.3kg |
Additional tree planting required to offset carbon created by electrical consumption - 3 trees are planted for every one that reaches maturity. (assuming 1 mature tree absorbs 21KG/Carbon Dioxide/Year)
Number of Mature Trees Required | FilterPod | Other Manufacturers |
---|---|---|
Worst Performance | 0 | 19.29 |
Best Performance | 0 | 6.63 |
Average Performance | 0 | 14.46 |
Protect the environment whilst saving money
Save Money
- FilterPod sewage treatment plants save up to £244/year in electricity bills
Protect the Environment
- Reduce your Carbon footprint by up to 135KG/Year
- Save the equivalent planting of up to 6 trees per year